Why project scheduling is the art? If it were a science then every
project would be delivered on time! In truth, the art of scheduling is based on
experience and the more experience you have, the more accurate your schedule
will be. However, you can still produce an accurate schedule by following some
simple rules.
Principles of Project Scheduling “Art”:
Rule 1: Never give off-the-cuff or unconsidered responses, i.e. don’t commit to something you can’t deliver
Scheduling
is one part prediction and one part expectation management. If you are
pressured into picking a date “on-the-fly” at a random meeting you can bet that
the date will not only be wrong, it will come back to haunt you. A considered
response when you have had time to evaluate all the factors is much better. A
date picked out of the air is good to no-one, least of all yourself.
Rule 2: Eliminate uncertainty wherever you can
The
more specific you can be in your project planning, the more accurate your
schedule will be. If you leave functionality or other items unspecified in your
plan, then you will, at best, only be able to approximate them in the schedule.
Don’t go overboard, though, there is a balance. If you are spending time adding
detail to tasks which will have no impact on the project delivery date, then
you are probably wasting your time.
Rule 3: Build in plenty of contingency to cope with variation
No
matter how well specified your project and how accurate your schedule, there
will be the inevitable random influences that will wreck your carefully crafted
schedule. People get sick, equipment fails and external factors join together
in a conspiracy to see that you miss your target date. In order to buy yourself
some insurance you should build in an adequate amount of contingency, so that
you can cope with unexpected delays.
You
should also spread contingency throughout your project timeline and not just
place it at the end. If you only have one pool of contingency allocated to the
end of your project you are leaving yourself with a large slice of uncertainty.
By breaking it up and spreading it throughout your project you allow yourself
more options and are able to control the project more closely. You can also
“buy back” time when you return unused contingency to the project.
Rule 4: Pick the right level of granularity
When
drawing up your schedule it is important to pick the right level of detail. If
you are going to require daily updates from your team then it makes sense to
break into day-by-day chunks. That way everybody has the same understanding of
what must be achieved by when.
On
the other hand if your project has large portions of time devoted to similar
activities, testing for example, then it may be better to simply block-schedule
one or two months of testing. Maybe you can leave the details up to your amount
of contingency, so that you can cope with unexpected delays.
You
should also spread contingency throughout your project timeline and not just
place it at the end. If you only have one pool of contingency allocated to the
end of your project you are leaving yourself with a large slice of uncertainty.
By breaking it up and spreading it throughout your project you allow yourself
more options and are able to control the project more closely. You can also
“buy back” time when you return unused contingency to the project.
Rule 5: Schedule for the unexpected
Project
management is the art of handling the unknown. Often events and circumstances
you could not have foreseen will interrupt the flow of your project. It’s your
job to take them all in your stride. Schedule for the most likely delays and
cope with them should they arise. If experience or instinct tells you that a
certain type of task will overrun, then anticipate it, pad it with some
contingency and make sure you have adequate resources on hand when it comes up.